After the drawings have been approved, pre engineered buildingsare frequently built in just a few weeks. Lower Cost: The systems approach results in significant cost savings in terms of design, manufacture, and on-site erection. Expansion Flexibility: Buildings can simply be lengthened by adding extra bays. Larger spans: Buildings can be supplied with clear spans of up to 80 meters.